Landlord EICR visits: how to plan, test and hand over the report

How to run landlord EICR visits in England: booking access, the 5-year rule, C1, C2 and FI codes, and getting the report to the landlord on time.

A landlord EICR looks like a simple job on the board: one property, one inspection, one report. In practice the time goes on everything around the testing. Getting into the property, finding the last report, chasing the landlord about remedial work and sending the paperwork on time all take longer than the test itself. This guide covers how electrical businesses can run landlord EICR visits so the report goes out on time and the follow-up work doesn’t get lost.

It covers privately rented homes in England. The rules in Wales, Scotland and Northern Ireland are different, so check them separately if you work there.

JobHandler electrician software, landlord EICR: an electrician checking the consumer unit in an empty rented flat

What the landlord has to do

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 put the duty on the landlord. They must have the fixed electrical installation inspected and tested by a qualified and competent person at least every 5 years, or sooner if the last report says so.

Once they have the landlord EICR, they must:

  • give a copy to the people already renting the home within 28 days of the inspection;
  • give a copy to anyone moving in before they move in;
  • send a copy to the local council within 7 days if the council asks for it;
  • keep a copy to hand to the person who does the next inspection.

If the report asks for remedial work or further investigation, the landlord has 28 days to get it done, or less if the report gives a shorter time. They then have to confirm in writing, to the people renting and to the council, that the work is done.

Your business doesn’t carry those duties, but your timing affects every one of them. A landlord EICR that sits in someone’s inbox for a fortnight eats half of the landlord’s 28 days.

Before the visit

Most wasted landlord EICR visits come from access. Someone has to let you in, and you need to turn the power off circuit by circuit, so the people living there need to know what to expect.

When the job is booked, ask the landlord or letting agent for:

  • the name and number of whoever will let you in;
  • the last landlord EICR, if they have it, so you can see earlier codes and the circuits listed;
  • anything they already know about, such as a tripping RCD or a new kitchen since the last report;
  • whether any part of the property is locked or used for storage.

Tell the household how long the inspection will take for the size of the property, and that the power will be off for parts of the visit. People working from home or running medical equipment need to know before the day, and so does anyone with a freezer full of food.

On the day

Agree the extent and limitations

Write down what you can and can’t inspect before you start. A loft you can’t reach, a sealed bath panel or a consumer unit behind fixed furniture all belong in the limitations, agreed with the landlord where you can. A limitation the landlord heard about first in the report tends to come back as a phone call.

Test and record as you go

Record test results circuit by circuit on site, against the model forms in BS 7671. Photos help: a damaged accessory, a missing blank in the consumer unit or a scorched socket explains itself far better than a line of text. Notes typed up later from memory are where mistakes creep in.

Code the observations clearly

The codes on the model forms are:

  • C1: danger present, with immediate action needed;
  • C2: potentially dangerous, with urgent remedial action needed;
  • C3: improvement recommended;
  • FI: further investigation needed without delay.

A landlord EICR with any C1, C2 or FI is unsatisfactory. If you find a C1, make it safe or tell the person responsible straight away, on site and in writing. Don’t leave it for the report to say.

After the visit

Get the report out the same day if you can

The landlord’s 28 days started when you finished. Send the landlord EICR as soon as it is signed, and send it to the person who asked for it. With letting agents that is often a central inbox, not the landlord.

Quote the remedial work at once

An unsatisfactory report needs work within 28 days. If you send the quote with the report, the landlord can approve it the same day, and you have time to book it in. Price each item so the landlord can see what each code costs to put right. If you’re unsure how to lay that out, our guide on how to write an electrical quote goes through it.

Keep the history by property

Landlords and agents often own or manage many homes. Keep each landlord EICR against the property as well as the customer, so whoever books the next one can find the last report, its codes and its photos in seconds. Gas engineers have the same problem with landlord gas checks every year; see what goes on a gas safety record.

For the official guidance, see electrical safety standards for landlords (opens in a new tab) on GOV.UK.

Landlord EICR visits in JobHandler

When JobHandler opens, one landlord or agent can hold many properties, each with its own history. Your electricians fill in the landlord EICR on their phone with test results, photos and two signatures, and the office sees each step as it happens. See more on JobHandler for electrical businesses.

This is general guidance. Regulated work and its records are your business’s responsibility, so check the current regulations and guidance before you rely on it.

Join the waiting list and we’ll email you when JobHandler opens.

Everything an electrical business needs

Electrician software at one price per person, with no job limits.

Quotes and money

  • Quotes with options, such as with or without surge protection
  • Bundles like “Socket install”: labour and parts together
  • Markup on parts
  • Stage invoices for rewires
  • Card and bank transfer payments

Office and scheduling

  • Colour board by day or week
  • Skills checks with in-date cards
  • No double bookings
  • Jobs suggested for gaps, by postcode
  • Supervisors see their own team’s jobs

Store and vans

  • Stock in each van, counted onto the invoice
  • Test meters and ladders given and returned
  • Transfers between electricians
  • Vehicles

Team and records

  • Office staff, electricians and subcontractors
  • Each person sees only what they need
  • One sign-in per person
  • Audit log kept for 6 years, never edited

Add-ons

Pay for these only if you use them.

Text pack Add-on

Booking confirmations and reminders by text, sent in your business’s name.

Live tracking Add-on

Your customer gets a “Track my engineer” link that shows where the engineer is.

Join the waiting list

Leave your name, email and trade. We’ll send one email to confirm, and another when JobHandler opens.

When it opens

  • A 14-day trial on your own jobs. You don’t need a card
  • No contract. Pay monthly or yearly, and stop when you like
  • Every price is on the website, inc VAT